1 |
Air Force |
Airborne Electro Optical Pod with Ground Based System |
02.03.2022 |
Feasibility study initiated |
2 |
Air Force |
Airborne Stand – Off Jammer |
02.03.2022 |
Feasibility study initiated |
3 |
Air Force |
Communication System with Indian Security Protocols |
02.03.2022 |
Feasibility study initiated |
4 |
Army |
Indian Light Tank |
02.03.2022 |
Aon accorded on 24.01.2023 |
5 |
Navy |
Medium Speed Marine Diesel Engine |
06.04.2022 |
AoN accorded on 16.03.2023 |
6 |
Navy |
URAN SSM complex Fire Control System |
06.04.2022 |
AoN accorded on 30.5.2022 |
7 |
Navy |
Electro-Optical IR search and Track (EOIRST) System |
06.04.2022 |
Feasibility study initiated |
8 |
Air Force |
Mobile Ground based Multipurpose Jammer System |
11.07.2022 |
Feasibility study initiated |
9 |
Navy |
30 mm Naval Surface Gun |
11.07.2022 |
Feasibility study initiated |
10 |
Navy |
127 mm Medium Calibre Gun |
21.06.2022 |
Feasibility study initiated |
11 |
Navy |
76 mm Super Rapid Gun Mount |
16.09.2022 |
Feasibility Study initiated |
12 |
Army |
Terminal End Secrecy Device (TESD) |
|
AoN: June 2009 DPR approved in Mar 2022. PSO under Issue. |
13 |
Army |
Tactical Communication System (TCS) |
|
AoN: June 2006 Contract signed with BEL in June 2021. FoPM completed. |
14 |
Navy |
12 MW Electric Propulsion System for Indian Naval Ships |
19.10.2022 |
Feasibility study in progress |
15 |
Navy |
Shipborne Laser Weapon System (30 kw) |
19.10.2022 |
Feasibility study in progress |
16 |
Navy |
4 MW Gas Turbine Generator |
16.01.2023 |
Feasibility study initiated |
17 |
Navy |
Extra Large Unmanned Underwater Vehicle (XLUUV) |
19.10.2022 |
Feasibility study in progress |
18 |
Air Force |
Development of Multiband Programmable RF Sensor Satellite |
19.10.2022 |
Feasibility study in progress |
19 |
Air Force |
Innovative Space Applications of Fourth/ Final Stage of Launch Vehicles |
19.10.2022 |
Feasibility study in progress |
20 |
Air Force |
High Throughput Communication Satellite in LEO |
19.10.2022 |
Feasibility study in progress |
21 |
Air Force |
On Orbit Maintenance and Refuelling (OOMR) technology in LEO |
19.10.2022 |
Feasibility study in progress |
22 |
Air Force |
On Orbit Propellant Storage and Transfer system |
19.10.2022 |
Feasibility study in progress |
23 |
Air Force |
Modular, Multi payload Configurable VLEO Vehicle/Bus |
19.10.2022 |
Feasibility study in progress |
24 |
Air Force |
CBRN Threat detection and Monitoring Sensors for VLEO Bus |
19.10.2022 |
Feasibility study in progress |
25 |
Air Force |
Advanced Extremely High Frequency (AEHF) GEO Satellite for Secure Comns |
19.10.2022 |
Feasibility study in progress |
26 |
Army |
Lightweight, Compact Ka band User Terminals for mobile Grnd & Airborne platforms |
19.10.2022 |
Feasibility study in progress |
27 |
HQIDS |
Transportable/Mobile Launch Sys for Small Satls (upto 650 Kgs) with integrated Launch Control Centre |
19.10.2022 |
Feasibility study in progress |
28 |
HQIDS |
Mobile Multi Object Tracking Radar with detection range upto 250 Kms |
19.10.2022 |
Feasibility study in progress |
29 |
HQIDS |
Development of a GEO Data Relay Satellite having high speed optical Inter-Satellite Link capable of communicating with Satellites in LEO |
19.10.2022 |
Feasibility study in progress |
30 |
HQIDS |
Highly Agile (Agility rate > 7°/sec) Small Satellite Constellation (2 satellites) for LEO |
19.10.2022 |
Feasibility study in progress |
31 |
HQIDS |
Modular SSTO Launch Vehicle System (Land/Sea launch) with Configurable Satellites Integration Mechanism for Launch on Demand of Small Satellites (Upto 150 kgs/400 Kms/48 Hrs)) |
19.10.2022 |
Feasibility study in progress |
32 |
HQIDS |
Modular TSTO Launch Vehicle System (Land/Sea launch) with Configurable Satellites Integration Mechanism for Launch on Demand of Small Satellites (Upto 500 kgs/400 Kms/72 Hrs) |
19.10.2022 |
Feasibility study in progress |
33 |
Air Force |
On Orbit Space Infra maintenance and upgrade operations |
19.10.2022 |
Feasibility study in progress |
34 |
Army |
Future Ready Combat Vehicle- Armoured Fighting Vehicle (FRCV-AFV) |
27.4.2023 |
Feasibility study completed |
35 |
Army |
1200-1500 HP Engine with Associated Automotive Peripherals (Power Pack) |
27.4.2023 |
Feasibility study initiated |
36 |
Army |
Army Integrated Decision Support System (AIDSS) |
27.4.2023 |
Feasibility study initiated |
37 |
Air force |
High Altitude Pseudo Satellite |
01/08/2023 |
Feasibility study initiated |
38 |
Air force |
Long Range Land Attack Cruise Missile |
01/08/2023 |
Feasibility study initiated |
39 |
HQIDS |
Modular small satellite bus for rapid integration into the launcher |
19/10/2022 |
Feasibility study initiated |
40 |
HQIDS |
Small Satellite Launch vehicle for launching satellite weighing 150 -650kg to LEO |
19/10/2022 |
Feasibility study initiated |
41 |
HQIDS |
V-band based Inter-satellite Link communication module for Small Satellites offering data rate upto 1.5 Gbps |
19/10/2022 |
Feasibility study initiated |
42 |
HQIDS |
Laser based comn system as modular payload for Small LEO satellites offering > 1.5 Gbps data transfer rate between LEO and GEO Data Relay Satl |
19/10/2022 |
Feasibility study initiated |
43 |
HQIDS |
Orbital Transfer Vehicle for Space Debris removal in LEO |
19/10/2022 |
Feasibility study initiated |
44 |
HQIDS |
Mini Imaging/Comn Satellites for Launch on Demand |
19/10/2022 |
Feasibility study initiated |