Dashboard For Defence Minister
Sl.No Organisation Name of Project AIP Date EOI Date Contract Date
1 HSL Flight Deck Hydraulic System 01.12.2019
2 HSL Pneumatic controlled Quick Closing valves 01.03.2019
Sl.No Organisation Item Code Name of Project AIP Date EOI Date Withdrawn on
1 HSL - Hydrostalic Level transmitters 18.3.2022 26.3.2022
2 HSL - Float Level switches 1.4.2022 26.3.2022
3 HSL - Smoke/Heat/Flame detectors 21.6.2022 26.3.2022
4 HSL - Stern gear polymer bearings 24.6.2022 30.6.2022
5 HSL - At sea, Fuel replenishment and transfer Hoses with probes 30.6.2022 30.6.2022
6 HSL - Cargo transfer pumps of different capacities for replenishment at sea 24.6.2022 30.6.2022
7 HSL - 170 CMH Ballast water treatment plant 11.9.2023 3.10.2023
8 HSL - 400 Bar Pressure reducer 2.3.2023 2.8.2022
9 HSL - 400 Bar Pressure reducer 2.3.2023 2.8.2022